March 2024
Intermediate to advanced
480 pages
13h 35m
English
| A | component availability |
| A | levelized annual cost, $ (Chapter 7) |
| A | weighted average Btu/kWh net generation (Chapter 2) |
| A, B, C | phase designation |
| A, B, C, D | general line (circuit) constants (Chapter 5) |
| A | feeder availability (Chapter 11) |
| Ai | availability of component i (Chapter 11) |
| An | area served by one of n substation feeders, mi2 |
| A | service-drop conductor size, cmil (Chapter 6) |
| ASL | secondary-line conductor size, cmil (Chapter 6) |
| Asys | system availability (Chapter 11) |
| AEC | annual equivalent of energy cost, $ |
| AEIC | annual equivalent of total installed capacitor bank cost, $ (Chapter 8) |
| AIC | annual equivalent of feeder investment cost, $ |
| B | average fuel cost, $/MBtu (Chapter 2) |
| BEC | original (base) annual ... |
Read now
Unlock full access