August 2015
Beginner to intermediate
1061 pages
31h 28m
English
A |
component availability (Chapter 11) |
A |
levelized annual cost, $ (Chapter 7) |
A |
weighted average Btu/kWh net generation (Chapter 2) |
A, B, C |
phase designation |
A, B, C, D |
general line (circuit) constants (Chapter 5) |
AFDR |
feeder availability (Chapter 11) |
Ai |
availability of component i (Chapter 11) |
An |
area served by one of n substation feeders, mi2 |
ASD |
service-drop conductor size, cmil (Chapter 6) |
ASL |
secondary-line conductor size, cmil (Chapter 6) |
Asys |
system availability (Chapter 11) |
AEC |
annual equivalent of energy cost, $ |
AEICc |
annual equivalent of total installed capacitor bank cost, $ (Chapter 8) |
AIC |
annual equivalent of feeder investment cost, $ |
B |
average fuel cost, $/MBtu ... |
Read now
Unlock full access