Skip to Main Content
Fluctuation Mechanism and Control on System Instantaneous Availability
book

Fluctuation Mechanism and Control on System Instantaneous Availability

by Yi Yang, Yong-Li Yu, Li-Chao Wang
January 2016
Intermediate to advanced content levelIntermediate to advanced
299 pages
6h 54m
English
CRC Press
Content preview from Fluctuation Mechanism and Control on System Instantaneous Availability
Analysis of Instantaneous Availability Fluctuation 247
the preventive maintenance cycle is 29. At this moment, from the mean availabil-
ity viewpoint, 29 can be considered as the optimal preventive maintenance cycle.
When the preventive maintenance cycle exceeds 50, it has almost no effect on the
system mean availability.
As seen in Figure 8.18, the system mean availability increases as the preven-
tive maintenance cycle N increases. When the preventive maintenance cycle is
large enough and, especially, when it exceeds the research time interval, it can be
interpreted as there being no preventive maintenance in the system. is system is
deg
Become an O’Reilly member and get unlimited access to this title plus top books and audiobooks from O’Reilly and nearly 200 top publishers, thousands of courses curated by job role, 150+ live events each month,
and much more.
Start your free trial

You might also like

Car PC Hacks

Car PC Hacks

Damien Stolarz
RFID Essentials

RFID Essentials

Bill Glover, Himanshu Bhatt
Reducing MTTD for High-Severity Incidents

Reducing MTTD for High-Severity Incidents

Tammy Bütow, Michael Kehoe, Jay Holler, Rodney Lester, Ramin Keene, Jordan Pritchard

Publisher Resources

ISBN: 9781498734684