Making New-Product Value Flow ◾ 199
illustrated in The Goal does not suggest it, we put a buffer at every function,
not just at the bottleneck (prototype manufacturing). In 2009, The Goldratt
Institute would at least partially conrm the efcacy of this approach in the
book Velocity.
6
Another suggestion from Velocity that we had already validated when
thebook came out was to make the bottleneck our schedule point and
thento keep it that way even after the bottleneck was eliminated and a
different bottleneck was identied. All the Herbie team had to do was put 2
and 2 together—we had a schedule point, we had a tool to manage the WIP,
andw