June 2012
Intermediate to advanced
1032 pages
49h 59m
English
In the Software Metering section, the only settings are to enable software metering and for the deployment reevaluation schedule. This defaults to seven days and should be adjusted to every one day, if the feature is enabled.
Read now
Unlock full access