The time needed per phase on any given project will vary according to the size of the organization, the organization culture, the scope of the project, and the complexity of the project.
Table 6.19 provides some estimates of times needed to execute the phase for small, medium, and large organizations.
Table 6.19 Sample Project Time Estimates
For some of the organization sizes, certain phases are not normally done. For example, a small organization will likely move from the design phase directly into a production deployment phase. There would be no need for a proof of concept or pilot phase with a small organization. This is reflected ...