6Inductive Load Switching

6.1 General

The inductive load switching cases to be considered are the switching of shunt reactors and unloaded transformers. Shunt reactor loads are 90° lagging in a number of load circuit configurations and represent an onerous switching duty for circuit breakers. Unloaded transformer switching also presents a lagging power factor, but less than 90°, and is generally not a significant test duty for circuit breakers. However, particularly in North America, air‐break disconnectors (also known as disconnect switches) are used to switch out unloaded transformers and this represents a special application case.

For the vast majority of shunt reactor installations, the circuit breaker is applied on the source side of the shunt reactor and variations with respect to the reactor neutral earthing are as shown in Figure 6.1. The variation in the shunt reactor neutral earthing is related to system voltages but also to individual utility requirements:

  • Shunt reactors with isolated neutrals are most common at system voltages below 72.5 kV but are also in use up to 170 kV in some countries.
  • Shunt reactors with earthed neutrals are in use at all system voltage levels.
  • Shunt reactors with neutrals earthed through a neutral reactor are mostly in use at voltages of 300 kV and above in order to enable single‐phase fault‐clearing and reclosing.

Each of the above variations represents a unique case from a transient analysis perspective. The variations can, however, ...

Become an O’Reilly member and get unlimited access to this title plus top books and audiobooks from O’Reilly and nearly 200 top publishers, thousands of courses curated by job role, 150+ live events each month,
and much more.

Read now

Unlock full access

More than 5,000 organizations count on O’Reilly

AirBnbBlueOriginElectronic ArtsHomeDepotNasdaqRakutenTata Consultancy Services

QuotationMarkO’Reilly covers everything we've got, with content to help us build a world-class technology community, upgrade the capabilities and competencies of our teams, and improve overall team performance as well as their engagement.
Julian F.
Head of Cybersecurity
QuotationMarkI wanted to learn C and C++, but it didn't click for me until I picked up an O'Reilly book. When I went on the O’Reilly platform, I was astonished to find all the books there, plus live events and sandboxes so you could play around with the technology.
Addison B.
Field Engineer
QuotationMarkI’ve been on the O’Reilly platform for more than eight years. I use a couple of learning platforms, but I'm on O'Reilly more than anybody else. When you're there, you start learning. I'm never disappointed.
Amir M.
Data Platform Tech Lead
QuotationMarkI'm always learning. So when I got on to O'Reilly, I was like a kid in a candy store. There are playlists. There are answers. There's on-demand training. It's worth its weight in gold, in terms of what it allows me to do.
Mark W.
Embedded Software Engineer

You might also like

Transient Analysis of Power Systems

Transient Analysis of Power Systems

Juan A. Martinez-Velasco
Cable System Transients

Cable System Transients

Akihiro Ametani, Teruo Ohno, Naoto Nagaoka
Excel® 2007 Charts

Excel® 2007 Charts

John Walkenbach

Publisher Resources

ISBN: 9781119547211