24Production Phase

There are two major objectives in the production phase. The first addresses production ramp (Table 24.1). The objective here is to quickly achieve design maturity and ramp to the desired production levels. The second major objective is to have mechanisms in place (quality controls) to ensure the quality of the product before volume production is achieved. The activities that take place in the production phase are illustrated in Table 24.2.

Table 24.1 Reliability activities in the production ramp Phase 5.

Product ramp phase
Participants Reliability activities Deliverables
  • Operations/Manufacturing
  1. All products have HASS until acceptable pass rate is achieved. ARG and ELT testing.
  1. HASS pass‐fail report. ARG and ELT report with run hours, number of units tested, all failures submitted to FRACAS.
  • Reliability engineering
  1. Operate FRACAS. All product and customer failures entered into FRACAS database and tracked to closure.
  1. Periodic FRACAS and FRB meeting. Failures tracked to closure.
  • Design engineering
  1. Start reliability growth. Product operating time and failure events entered into reliability growth chart. Progress at removing failure modes is evaluated.
  1. Reliability growth curves.
  • Manufacturing engineer
  1. FMEA is performed (on any significant design changes only) and process FMEA.
  1. Completed FMEA spreadsheet and closure on corrective action items.
  • Test engineering
  1. SPC program initiated. Production yield ...
Become an O’Reilly member and get unlimited access to this title plus top books and audiobooks from O’Reilly and nearly 200 top publishers, thousands of courses curated by job role, 150+ live events each month,
and much more.

Read now

Unlock full access

More than 5,000 organizations count on O’Reilly

AirBnbBlueOriginElectronic ArtsHomeDepotNasdaqRakutenTata Consultancy Services

QuotationMarkO’Reilly covers everything we've got, with content to help us build a world-class technology community, upgrade the capabilities and competencies of our teams, and improve overall team performance as well as their engagement.
Julian F.
Head of Cybersecurity
QuotationMarkI wanted to learn C and C++, but it didn't click for me until I picked up an O'Reilly book. When I went on the O’Reilly platform, I was astonished to find all the books there, plus live events and sandboxes so you could play around with the technology.
Addison B.
Field Engineer
QuotationMarkI’ve been on the O’Reilly platform for more than eight years. I use a couple of learning platforms, but I'm on O'Reilly more than anybody else. When you're there, you start learning. I'm never disappointed.
Amir M.
Data Platform Tech Lead
QuotationMarkI'm always learning. So when I got on to O'Reilly, I was like a kid in a candy store. There are playlists. There are answers. There's on-demand training. It's worth its weight in gold, in terms of what it allows me to do.
Mark W.
Embedded Software Engineer

You might also like

Design for Reliability

Design for Reliability

Dev G. Raheja, Louis J. Gullo
The Hidden Cost of AI-Assisted Creativity

The Hidden Cost of AI-Assisted Creativity

Léonard Boussioux, Anil Doshi, Oliver Hauser, Kartik Hosanagar

Publisher Resources

ISBN: 9781119179399Purchase book