5.1. Managing supply – traditional model
Managing supply under the traditional model is based on the waterfall method (see Figure 5.1, derived from Figure 2.1), so called because of the image of water falling over successive phases, each performed by different teams of specialists and conditioned by signed-off acceptance before being able to proceed with the next one. And since water can't flow upstream, the clear message is that sign off and commitment for a given phase is a one-way journey, with any return upstream very difficult. Furthermore, each phase or process is subject to the 'it's not my problem' problem explained in Chapter 2.
This rigidly procedural, life-cycle approach starts off with analysts sitting down with business users in an attempt to document requirements. We saw in Chapter 3 how this phase yields a detailed, contractually signed-off SoR, and its inherent disadvantages.
Depending on the buy or build decision, this detailed requirements document would then drive either:
In the case of a decision to build, a sequential waterfall method, i.e. a strict linear approach from analysis, design, development and testing through to implementation, with each phase performed by different teams of specialists.
In the case of a decision to buy, an often lengthy package evaluation process – which in extreme cases can be likened to the search for the holy grail, with a requirements document weighing in at over a hundred pages. This is then followed by the configuration and ...
Become an O’Reilly member and get unlimited access to this title plus top books and audiobooks from O’Reilly and nearly 200 top publishers, thousands of courses curated by job role, 150+ live events each month,
and much more.
Read now
Unlock full access