You will need the following before you proceed with the upgrade:
- An understanding of the current topology: You will need to identify all of the PSCs in a single SSO domain. vCenters corresponding to these PSCs will be in an Enhanced Linked Mode (ELM) configuration.
- Temporary IP addresses for the PSC appliances that will be deployed: A temporary IP is assigned to the appliance during its installation so that the data/configuration can be transferred from the source PSC to the appliance. The new appliance will take the identity of the source PSC during the final stage of the upgrade (after the data transfer is complete).
- Create a snapshot of the source PSC (Optional).