Skip to Content
Engineering Documentation Control / Configuration Management Standards Manual
book

Engineering Documentation Control / Configuration Management Standards Manual

by Frank B. Watts
May 2018
Intermediate to advanced
192 pages
3h
English
Wiley-Scrivener
Content preview from Engineering Documentation Control / Configuration Management Standards Manual

Chapter 39Closing a Change

Purpose

  • To define the requirements for closing a change.

Applicability

  • All changes processed by this CM function.

Policy/Practice

  • Document Only changes will be closed after the Item Master and BOM have been updated and checked and the master design documents have been updated and checked — in either order.
  • The Quality Function shall assure that the manuals match the product as shipped.
  • Product changes will be closed only after all of the following tasks have been completed (modify to suit):
    1. The change has been implemented in the product as evidenced by the posting of the actual effectivity on the change form.
    2. The backup file of the updated master documents, parts lists and change form (as required) has been completed and stored off-site.
    3. A digital copy of the revised documents has been stored off-site.
    4. The field change package has been completed if applicable, modeled and signed as applicable.
  • The CM function will then close the change form and enter the date of completion of whichever of the above requirements is completed last.

Procedure

  • See the Change Form Standard and process flow.

Primary Responsibility

  • The CM function shall keep this standard up to date.

Authorization

Authorization

Director of Engineering Services

Director of QA

Become an O’Reilly member and get unlimited access to this title plus top books and audiobooks from O’Reilly and nearly 200 top publishers, thousands of courses curated by job role, 150+ live events each month,
and much more.

Read now

Unlock full access

More than 5,000 organizations count on O’Reilly

AirBnbBlueOriginElectronic ArtsHomeDepotNasdaqRakutenTata Consultancy Services

QuotationMarkO’Reilly covers everything we've got, with content to help us build a world-class technology community, upgrade the capabilities and competencies of our teams, and improve overall team performance as well as their engagement.
Julian F.
Head of Cybersecurity
QuotationMarkI wanted to learn C and C++, but it didn't click for me until I picked up an O'Reilly book. When I went on the O’Reilly platform, I was astonished to find all the books there, plus live events and sandboxes so you could play around with the technology.
Addison B.
Field Engineer
QuotationMarkI’ve been on the O’Reilly platform for more than eight years. I use a couple of learning platforms, but I'm on O'Reilly more than anybody else. When you're there, you start learning. I'm never disappointed.
Amir M.
Data Platform Tech Lead
QuotationMarkI'm always learning. So when I got on to O'Reilly, I was like a kid in a candy store. There are playlists. There are answers. There's on-demand training. It's worth its weight in gold, in terms of what it allows me to do.
Mark W.
Embedded Software Engineer

You might also like

Practice Standard for Project Configuration Management

Practice Standard for Project Configuration Management

Project Management Institute

Publisher Resources

ISBN: 9781119479031Purchase book