
218 SOF T WARE ENGINEERING AND TESTING
1. Risk Avoidance
Risk Anticipation: V
arious risk anticipation rules are listed according to
standards from previous projects, experience, and also as mentioned by
the project manager.
Risk T
ools: Risk tools are used to test whether the software is risk-free. The
tools have a built-in database of available risk areas and can be updated
depending upon the type of project.
2. Risk Detection
The risk-detection algorithm detects a risk and it can be categorically stated as
the following:
Risk Analysis: In this phase, the risk is analyzed with various har
dware and
software parameters as pr