
Chapter 3. Collecting your inventory 71
The first time you scan a CICS region, continue with the sections 3.5.2, “Monitor and review
the batch job” on page 71 and 3.5.3, “Verify your CICS resources in the database” on
page 72.
After you become familiar with the entire process, repeat this procedure to scan the contents
for each of your other production CICS regions, as needed.
Modifying the JCL
If you are loading a region and you want all of your information collected, you do not have to
do this activity; by default, all groups in the CSD are examined.
However, in our system, we are going to load only resources specific for our sample
application. ...