Inspection and tests to be carried out
1
65
Following the inspection, tests should be carried out in accordance with the
IEE Regulations quoted above. The tests normally applicable to domestic
installations are listed below and it is important that these are carried out in
the order shown so as to avoid danger from the test voltage should faults be
present during the tests, e.g. a disconnection of
the
protective conductor. The
IEE Regulations permit methods of testing other than those prescribed in the
Regulations, provided they are equally effective:
(a) continuity of protective conductors and bonding
(b) continuity of ring circuits
(c) insulatio ...