
with water and check for any leaks. If any holes
are found these can be filled in with epoxy filler
prior to use.
5. ASSEMBLY
Assembly requires patience and five lengths of
wire: 1 short (~11cm) and 4 long (~20cm each).
Start with the suspension points at the apex of
the pyramid forms. File a small notch at one point
in the circumference of each hole.
Thread the short wire through the hole in the
apex, allowing 3cm excess, and fit an M2.5 screw;
this will grip the wire and retain the screw in the
hole. Wrap the excess wire around the screw
at the bottom of the screw head. Allow 5cm of
suspension between pyramids, and repeat the
same process on ...