July 2013
Intermediate to advanced
208 pages
4h 26m
English
Acceptance testing, 63, 124, 132
Accountability, 147, 153, 154, 159
of stakeholders, 156
Austin, Rob, 154
Automated Baggage Handling System (ABHS), 22-23, 25-28, 70, 184
Benefit, 63, 64, 109, 146ff., 151, 152-53, 154, 161, 162
calculation, 149
Boehm, Barry W., 119, 150, 158, 190
constraints, 159
Can-do, 13, 16, 31, 40, 61-62, 114-26, 171
Capability Maturity Model (CMM), 15, 23
brainstorming, 116
list, 45
Read now
Unlock full access