
Process and Capacity Analysis 215
had been added over a period of time to meet quality and
quantity requirements. The time taken for such operations
had increased the lead time considerably.
The study identified certain areas that should either be
eliminated or streamlined, which would result in lead time
reduction. These are as follows: excessive material movement,
wiring harness operation streamlining (existing), reorganizing
the stores activities, elimination of duplicate-inspection activ-
ity in the organization, elimination of the PCB bottom plate
in the wiring harness sub-assembly, and reduction of rework
online.
QUESTIONS FOR DISCUSSION ...