
Operations Planning 431
�
Difficulty level in altering operation rates: Operational systems are complex. Varying the rate of operation from one level to
another requires some amount of prior planning and coordination with related systems on the supplier and distribu-
tor sides. Thus, an organization manufacturing diesel engines at the rate of 4,000 engines per day cannot unilaterally
change it to 5,000 engines. It needs to ensure that the required material, capacity, and other resources are available for
the incremental plan. Similarly, it needs to ensure that the distributors have the required capacity to handle the addi-
tional load on them. ...