August 2008
Intermediate to advanced
408 pages
7h 6m
English
This appendix presents a listing of the tables of various structures that are available within OmniClass™ Edition 1.0 in order to provide the reader with a broad selection of hierarchical structures.1 Of these tables, Table 22 is the one of primary interest. It is essentially the same as the MasterFormat™ table of CSI.
Table Number |
Discussion |
Table 11 – Construction Entities by Function |
Definition: Construction Entities by Function are significant, definable units of the built environment comprised of elements and interrelated spaces and characterized by function. |
Examples: Single Family Residences, Mining Facility, Local Transit Bus Station, Interstate Highway, Waste Water Treatment Facility, ... |
Read now
Unlock full access