May 2018
Beginner
490 pages
13h 16m
English
The whole concept of this DQN-CRL-MNN of real-time production, applied to P3, is to optimize Z over the load distribution of the assembly stations, as explained before. This means reducing Z as much as possible through the following equation:

To achieve that optimization goal, Z needs to be taken apart and applied to strategic parts of the code.
Read now
Unlock full access