GAP – loaded or unloaded
In Chapter 12, Automated Planning and Scheduling, CRLMM will be applied to automatic planning and scheduling (APS). When planning in general, in a factory for example, a key concept of a gap is unloaded, loaded.
Set the scenario to 0 in CNN_TDC_STRATEGY.py to run this conceptual model: scenario=0 #reference to A,MS1,MS2.
The gap concept has just become a polysemy word concept (polysemy means different meanings; see Chapter 8, Revolutions Designed for Some Corporations and Disruptive Innovations Small to Large Companies).
In the cake situation, the Γ gap was negative in its g1 subset of meaning and concepts applied to a CNN, relating it to negative images n+g1:
ng1={missing, not enough, slowing production down...bad} ...
Become an O’Reilly member and get unlimited access to this title plus top books and audiobooks from O’Reilly and nearly 200 top publishers, thousands of courses curated by job role, 150+ live events each month,
and much more.
Read now
Unlock full access