
Chapter 13. RAS, monitoring, and troubleshooting for an IBM Storwize V7000 system 567
Figure 13-51 shows the location of power switches on the controller and
expansion enclosures.
Figure 13-51 Location of power switches
13.11.4 Shutting down
To shut down the infrastructure, complete the following steps:
1. Shut down your servers and all applications.
2. Shut down your IBM Storwize V7000 system:
a. Shut down the cluster using either the GUI or CLI.
b. Power off both switches of the controller enclosure.
c. Power off both switches of all the expansion enclosures.
3. Shut down your SAN switches.
13.11.5 Powering on
To power on your infrastructure, complete ...