Chapter 2. xCAT introduction 27
– SSH for remote control of the nodes
– SNMP for hardware alerts
See Chapter 4, “Management node installation” on page 43, and Chapter 5,
“Management node configuration” on page 57.
2.2.4 Cluster installation
Once the management node is fully configured, we need to configure and install
the other components in the cluster. This is explained in detail in Chapter 6,
“Cluster installation” on page 83.
The installation process for the cluster happens in four stages.
1. Stage 1: Hardware setup
2. Stage 2: MAC address collection
3. Stage 3: Management processor setup
4. Stage 4: Node installation
Stage 1: Hardware setup
In this stage we set up all the hardware components in the cluster. The hardware
setup can be done before ...