
© Copyright IBM Corp. 2002. All rights reserved. 83
Chapter 6. Cluster installation
This chapter describes the steps required to prepare your cluster nodes for use.
At this point you have a functional management node, and xCAT has been
installed and configured. You would also use some or all of these steps to add
additional nodes or racks of nodes to your existing cluster.
In this chapter the following topics are described:
Configuring the network switch
Preparing the Management Supervisor Network
Setting up your terminal servers
Updating the cluster node BIOS and BIOS settings
Collecting hardware MAC address information
Installing an operating ...