
32 Building a Linux HPC Cluster with xCAT
3.1 Node hardware installation
The first thing to do is to prepare each individual node before it goes into the
rack. This means installing the usual additional options, such as a second CPU,
memory, and hard disks. If your cluster was purchased with integration services,
this work has already been done for you, but you should understand the steps
involved in case hardware components need to be added or replaced.
Management node (x342)
We use the built-in Ethernet port for connecting to the customer network, so we
add another FastEthernet card for the management processor network (MPN)
link. For bette