Layout of process plant at a single plot level is intimately linked with process design. Process, economic, operational, maintenance, safety, and construction aspects of design must be considered to obtain a good plot layout.
Plot layout; process; economic; operational; maintenance; safety; construction
The theoretical minimum space a process plant can occupy is greater than the sum of its various components. However, there are, in practice, various constraints which prevent the attainment of even this theoretical minimum.
These include the provision of adequate clearances for access during operation, maintenance, and construction activities, as well as for the prevention ...