July 2013
Intermediate to advanced
328 pages
7h 31m
English
There are three key focus areas for the Endgame Release Framework:
• historical notes
• plan details
• endgame flow
I outline guidelines for constructing these, in the sections that follow.
• Capture the historical defect trends to be used in determining planning levels, such as
• defects found per testing cycle
• defects repaired per testing cycle
• defect trend characteristics (open/closed, find/fix, and overall repair capabilities)
• Determine the number of weeks it took to achieve code freeze for similarly sized projects.
• Utilize settling metrics that reflect the testing cycles required to achieve application or product stability. Usually, these are captured ...
Read now
Unlock full access