
20-6 Industrial Communication Systems
the sampling period T, while the time spent between the sampling and the actuation instants is negli-
gible
or
constant
and
known;
but
the
sampling
and
actuation
messages
take
some
time,
which
depends
on
the
access
scheme
and
the
relationship
used,
and
the
control
law
requires
some
computation
time,
so
the
above
assumption
does
not
hold.
is
eect
becomes
more
important
as
the
network
trac
load
increases.
Considering
an
NBC
scheme
(Figure
20.2),
in
which
the
control
loops
consist
of
plants
G,
and
con-
trollers
C,
which
exchange
through
messages
the
sampled
variables
y(kT)
and
the
control
variables
c(kT),