August 2018
Intermediate to advanced
438 pages
12h 3m
English
The final step of the CRISP-DM model is deployment to production. The models that have been developed, fined-tuned, validated, and tested during multiple iterations are saved and prepared for production environment. A proper deployment plan is built, which includes details on hardware and software requirements. The deployment stage also includes putting in place checks and monitoring aspects to evaluate the model in production for results, performance, and other metrics.
Read now
Unlock full access