January 2002
Intermediate to advanced
288 pages
6h 9m
English
The CM plan presented here specifies the CM environment and the directory structure to be followed in the ACIC project. (The CM plan for a different case study is given in my earlier book.5) The ACIC CM plan clarifies that under the project area is a directory structure, controlled through the Visual Source Safe (VSS) tool, where all documents that need to be controlled are kept. Source code files are controlled through the Visual Age for Java (VAJ) tool. Within the VSS directory, the various directories are specified; the names clearly indicate what goes in these directories. The user area, which is uncontrolled, is also specified; there is a directory for each user, and each team member is supposed ...