
160 ESTIMATING LABOUR REQUIRED FOR ERECTION
Section 38
SMALL BORE AND MICRO BORE DOMESTIC CENTRAL
HEATING
The information given in this section applies particularly to small bore installations
in houses and bungalows and is supplementary to Sections 2, 3, 5, 8, 9, 10, 11, 12, 17,
18,
19, 23, 24, 25, 26, and 35.
Packaged, Prewired Gas and Oil Fired Boiler Units for Domestic
Small Bore Hot Water Space Heating, and Hot Water Supply
Offload at site, packaged boiler unit and flue connections, and move to fixing position
in ground floor room of new unoccupied building. Mark out boiler base for builder,
place unit in position. Connect to prepare