36 ◾ Lean Production Simplified, Third Edition
Muri
Muri
19
means “hard to do” and can be caused by variations in produc-
tion, poor job design or ergonomics, poor part fit, inadequate tools or jigs,
unclear specifications, and so on.
Figure2.8 illustrates the relationship between muda, mura, and muri.
Summary
I have introduced the House of Lean Production around which the book is
organized. A central goal of the Lean system is to eliminate waste so as to
improve profitability, the only effective strategy under the new economics.
Lean activities are interrelated and mutually supportive and are informed by
the same way of thinking.
The eight differen ...