November 2011
Intermediate to advanced
608 pages
13h 33m
English
In this chapter we will cover the post-installation steps that are performed for both ABAP and Java stack installations. With the addition of Java stack, dual-stack installation options, and enhancement packages, the time required to perform post-installation activities has increased significantly. It takes as much time to perform the post-installation tasks as it does to perform the actual install. ABAP and Java support package application and post-install configuration activities are the most time-consuming steps in the post-installation activities. Other post-installation activities include basic login checks at the application and operating system levels, initializing the SAP transport management ...