January 2018
Intermediate to advanced
574 pages
14h 44m
English
Setting Failback to Yes (default) will let a recovered uplink resume its active role. In other words, a failed active uplink, when returned to normalcy, will be redesignated as the active uplink. The impact of this configuration is dependent on the Failover Order configured.
Read now
Unlock full access