272 ◾ Appendix C (Chapter 5)
5. Modify Run Hours on an Assembly Operation.
a. Create Cost Type “Simulated.”
b. Rollover Cost Type Current Manufacturing into “Simulated” and then perform a Cost
Generation.
c. Modify RUN HOURS on an Operation and review cost eect.
d. Delete an operation and review cost eect.
e. Add a new operation and review cost eect.
f. Run Cost Generation.
g. Compare cost eect of routing changes on Current Manufacturing and Current
Engineering cost types.
h. On Cost Type “Simulated,” set Cost Type usage to CLEAR and review cost eect of
“Simulated” costs.
i. Delete (attempt) Cost Type Simulated.
Note: Keep a diary of the cost changes and highlight dierences between “expected results” and
“actual resul ...