444 Appendix I
• Control plans are revised and updated when products or pro-
cesses differ from those in current production.
• Process variability monitoring/reduction
• Supplier has determined appropriate statistical techniques. A
key aspect of defect prevention is process variability reduction
and the use of SPC or an equivalent process monitoring method
to indicate when action is necessary and, conversely, when pro-
cesses should be left alone.
• Operator-based SPC control charts are optimized for statistically
valid sample frequency, sample size, and appropriate chart type.
SPC checks are performed on a timely basis and out-of-control
conditions prompt corrective action as appropriate.
• SPC data is maintained, monitored, and used by t