
287Supplier’s Perspective on the PPAP
• Alerts: An interim PSW always needs an alert and vice versa. A
copyof the alert must be attached to the PSW. The alert num-
bermust be entered in the “Additional Engineering Changes”
box and a brief one-line description in the “Explanation/
Comments” box. For capacity issues, write the actual versus the
daily production volume (DPV) needed (taken from the request
for quote [RFQ]).
• Submission results: An interim PSW alwaysmeans the “No” box
is ticked by the supplier on the PSW. The “Yes” box should be
ticked for capacity reasons only because all specications are met.
• Format: An interim PSW must hav ...