179Chapter eleven: LSS process, steps, tools, and statistics
• Financial responsibility of Six Sigma member positively affects the selection of
appropriate methodology (DMAIC).
• The role of black belts positively affects the selection of appropriate methodology
(DMAIC).
• The selection of the appropriate methodology (DMAIC) has a signicant effect on the
plan phase of the PDCA cycle.
• The selection of the appropriate methodology (DMAIC) has a signicant effect on the
do phase of the PDCA cycle.
• The selection of the appropriate methodology (DMAIC) has a signicant effect on the
check phase of the PDCA cycle.
• The selection of the appropriate methodology (DMAIC) has a signicant effect on the
act phase of the PDCA cycle.
• The plan phase ...