354 Quality management for organizations using Lean Six Sigma techniques
• Design responsibility is assigned to each department.
• Job will be assigned to a person for the preparation of failure mode and effect analysis.
• Provide time information to the FMEA and prepare any revision if it is required at
any level.
• The part number or subsystem number that is being analyzed needs to be specied.
• Component function is studied thoroughly.
• Potential failure mode is analyzed.
• Potential effects of failure mode are also analyzed.
• Causes for the failure effects are studied.
• Appropriate control measures are sorted to avoid the failure from occurring (Quality
Council of Indiana Inc. 2007).
15.4.6.2 Risk assessment and risk priority number ...