September 2012
Intermediate to advanced
1680 pages
88h 3m
English
After Operations Manager 2012 has been installed and configured, ongoing work needs to be done to ensure that the product performs as expected. The two primary activities are to, first, tune the MPs to ensure that alerts are valid for the environment and that alert noise is reduced and, second, produce reports of the information that Operations Manager 2012 is collecting.
Read now
Unlock full access